Blog · Board and management reporting · Freight brokers and 3PLs
The complete carrier concentration calculation on ten loads across two lanes, small enough to check by hand: loads per carrier per lane, the top carrier's share, carriers used, the threshold by the lane's volume band, the top carrier's tender acceptance over the trailing eight weeks against eight weeks before, the two carrier subsidiaries that roll up to one, the shipper revenue exposed, and the assertion that loads per lane equal the sum across carriers, so a reader can reproduce every figure and then run it on their own load ledger.
Carrier concentration is a count per carrier per lane and a share, and on ten loads it can be done by hand, including the subsidiary roll-up and the acceptance trend that changes the reading. This page works the roll-up, the shares, the thresholds, the trend, the exposure and the assertion.
| Load | Lane | Carrier in ledger | Carrier group | Shipper | Revenue |
|---|---|---|---|---|---|
| 1 | CHI to DAL | C-1 | G-1 | S-1 | $2,100 |
| 2 | CHI to DAL | C-1B | G-1 | S-1 | $2,050 |
| 3 | CHI to DAL | C-2 | G-2 | S-1 | $2,200 |
| 4 | CHI to DAL | C-1 | G-1 | S-2 | $2,000 |
| 5 | CHI to DAL | C-3 | G-3 | S-1 | $2,150 |
| 6 | CHI to DAL | C-1B | G-1 | S-2 | $2,100 |
| 7 | ATL to MIA | C-4 | G-4 | S-3 | $1,400 |
| 8 | ATL to MIA | C-5 | G-5 | S-3 | $1,350 |
| 9 | ATL to MIA | C-4 | G-4 | S-3 | $1,450 |
| 10 | ATL to MIA | C-6 | G-6 | S-4 | $1,400 |
Carrier master: C-1 and C-1B are subsidiaries of group G-1.
| Lane | Loads | Groups used | Top group | Top group loads | Top share |
|---|---|---|---|---|---|
| CHI to DAL | 6 | 3 | G-1 | 4 | 67% |
| ATL to MIA | 4 | 3 | G-4 | 2 | 50% |
Without the roll-up: CHI to DAL shows C-1 at 2 of 6, 33 percent, four carriers. The concentration is hidden in the subsidiary.
loads per lane = Σ carriers' loads: CHI to DAL 4 + 1 + 1 = 6; ATL to MIA 2 + 1 + 1 = 4. Holds.
| Loads per month | Threshold |
|---|---|
| Under 10 | Not assessed |
| 10 to 50 | 85% |
| 50 to 200 | 70% |
| Over 200 | 55% |
The ten loads cover two weeks; CHI to DAL's six are about thirteen a month, so it is assessed at 85 percent: 67 is under. On a real quarter's ledger the lane's monthly volume decides the band; the page states it.
| Period | Tenders to G-1 | Accepted | Acceptance |
|---|---|---|---|
| Eight weeks before last | 48 | 46 | 96% |
| Last eight weeks | 52 | 41 | 79% |
Seventeen points down. G-1 holds two thirds of the lane and is starting to refuse it.
| Lane | Shipper revenue on the lane | Share with the top group | Exposed |
|---|---|---|---|
| CHI to DAL | $12,600 (two weeks) | 67% | $8,250; about $18,000 a month |
| Lane | Level | Trend | Finding |
|---|---|---|---|
| CHI to DAL | 67%, under threshold | Acceptance −17 pts | Yes: the trend |
| ATL to MIA | 50% | Steady | No |
Subsidiaries separate. 33 percent and four carriers; nothing to see.
Level without trend. Under threshold; filed.
One threshold for all lanes. Both lanes flagged, or neither.
Uncovered loads dropped. A load with no carrier is the lane's current risk; it is listed, not omitted.
The same roll-up, share and threshold per lane, the same acceptance trend per carrier per lane, every week. Covirage runs it on the load ledger, the tender log and the carrier master. The carrier concentration guide covers the measure, and the tender rejection guide covers the trend that makes it a finding.
Because C-1 and C-1B are one carrier group with one capacity decision. Counted separately, the Chicago lane shows 50 percent top-carrier share and four carriers; rolled up, 67 and three. The carrier master carries the group.
A lane with four loads every two weeks is always concentrated and that is fine; a lane with two hundred a month at 80 percent is exposure. The threshold per volume band is stated; ten loads over two weeks is a small lane and the threshold is high.
Because the level is just under threshold and the top carrier's acceptance has dropped seventeen points. Concentration is a fact; falling acceptance from the carrier that holds two thirds of the lane is the warning that the lane is about to cascade.