Sign in

Glossary

Substitution pair

A guide or contracted item that stopped being ordered and an off-guide item in the same category that started, at the same accounts. Aggregated across the base, the pairs are the maintenance list for guides, catalogs or contracts.

DefinitionA guide or contracted item that stopped being ordered and an off-guide item in the same category that started, at the same accounts. Aggregated across the base, the pairs are the maintenance list for guides, catalogs or contracts.

Same category, same accounts, same period

The three conditions that separate a substitution from a new need.

Check the rebate

A brand switch that leaves the rebate-eligible item is a cost to the account as well as to the guide.

How it is computed

An item on the guide or contract that stopped being ordered, paired with an off-guide item in the same category that started at about the same time.

Example

A kitchen stopped ordering the contracted fryer oil in March and began ordering a different brand from the same distributor at a lower margin.

Where it goes wrong

Seen as one product declining and another growing, in two different reports.