Sign in

Blog · Data quality and reconciliation

The identity by industry: what has to sum to what on twelve desks

Every report on this site rests on an identity, a sum that must hold before any measure is read, and the sum is different on every desk: revenue to the ledger, TEU to booked TEU, seats to contracted seats, controls to the register, rental days to invoiced revenue. This hub gives, for twelve industries, the identity, the exports it joins, the failure it most often catches, and the guide where it is used.

The short answerAn identity is a sum that must hold: region equals team equals person equals account equals the ledger; booked TEU equals invoiced TEU per mode; contracted seats times price equals ARR; obligations equal mapped plus in progress plus unmapped. It is checked on every upload before any measure is read, and a failure is listed by row. The identity is different on every desk because the ledger is, and the failure it catches is usually the same three things: a duplicate, a missing mapping, or a period cut wrong.

Every measure on this site is read only after its identity holds. The identity is the sum that ties the analysis to the desk's ledger of record, and it differs by desk. This hub gives, for twelve industries, the identity, what it joins, what it most often catches, and where it is used.

The identity, in general

Σ at every level of the hierarchy = the ledger of record, for the period every row belongs to exactly one parent at each level

Twelve desks

Industry Identity Joins Most often catches Guide
General B2B sales Σ region = Σ team = Σ person = Σ account = ledger Ledger, assignments An account under two reps Roll-up hierarchy
Shipping and logistics Booked = invoiced, per mode, in the mode's unit Bookings, invoices A mode mislabelled; TEU added to kilograms TEU and chargeable weight
SaaS Contracted seats × price = ARR; cohorts sum to the bridge Contract register, subscription ledger A customer in two cohorts Net revenue retention by cohort
Compliance Obligations = mapped + in progress + unmapped; controls = on cadence + slipped + never tested Registers, testing log A control mapped to a retired obligation Testing cadence
Oilfield services Rental days × rate = invoiced rental revenue Rental ledger, fleet register A contract with no invoice Rental fleet utilization
Healthcare supplies Σ systems = Σ facilities = Σ ship-tos = revenue, dated Ship-to, facility masters, orders A hospital under two systems after an acquisition Facility identifiers
Foodservice Chain delivered = Σ sites; order lines = on-guide + off-guide Delivery ledger, site master, guide file A delivered site not in the master Chain versus site
Freight brokerage Σ loads' margin = ledger gross margin; loads per lane = Σ carriers Load ledger A load not yet settled Margin per load
Sports Σ delivered units ≤ capacity per asset per fixture; seats used ≤ seats held Sales ledger, delivery log, access control An asset oversold; a pass shared Inventory utilization per fixture
Professional services Σ practices' supply hours = firm hours; billed fees = Σ partners = Σ clients Roster, time entries, bills A person in two practices Sold work against the bench
Procurement Total spend = on contract + approved + unmanaged; committed = ordered + shortfall Payables, contracts, approved list An uncategorized invoice Spend under management
Finance and sales together Bookings = Σ billings = Σ revenue over a contract's term Contracts, invoices, revenue schedule A schedule never built Bookings, billings and revenue

The three failures behind most identities

Failure Looks like Fix
A duplicate One entity under two parents; a total above the ledger A dated mapping; a merge confirmed by a person
A missing mapping Revenue with no owner; a site with no system; a claim with no policy The mapping row, dated
A period cut wrong Ledger on the month; activities on the last 30 days Re-export on the same cut

Where it goes wrong, everywhere

Identity not checked. The measure is computed on a sum that does not hold.

Failure adjusted silently. The number is patched; the source is not fixed.

One identity where there are two. The ledger reconciles; the register does not.

Checked once. The identity is checked on every upload, or it is not checked.

One rule, every desk

Covirage checks the desk's identity on every upload, before any measure, and lists failures by row. The reconciliation term has the short definition, and the validation report guide covers where the identity line sits among the six.

Questions people ask

Why check the identity before the measures?

Because a measure computed on a roll-up that does not sum is wrong in a way no downstream check can find. A coverage figure on an account list with duplicates, a share on a ledger missing a day: both look fine and both are wrong. The identity is the one check that tests the whole.

What does a failure look like?

A list of rows: the account under two owners, the container with no events, the invoice with no contract price, the control mapped to a retired obligation. Never a silent adjustment. The person who dropped the file sees the rows and fixes the source.

Is there always an identity?

Every desk has a ledger of record, and the analysis has to sum to it. Where a desk has two, the ledger and a register, there are two identities, and the hub shows both where they apply.