Sign in

Blog · Finance metrics and formulas · Finance and FP&A teams

Breakeven price: formula and worked example

Breakeven price is the selling price that covers all included costs at a stated sales volume. Work through a distributor's cost export, compare volume assumptions, and check the effect of percentage fees.

The short answerBreakeven price is the net selling price that covers variable and fixed costs at a specified sales volume. Calculate it as variable cost per unit plus fixed costs divided by units sold. With variable costs of $12 per unit, monthly fixed costs of $30,000, and 3,000 units sold, the breakeven price is $22 per unit.

Breakeven price is variable cost per unit plus fixed costs divided by the number of units you expect to sell. It answers a pricing question at a stated volume: what net price covers the included costs without leaving a profit or loss?

Start with the price formula

Breakeven price per unit = Variable cost per unit + Fixed costs / Units sold

Proof: Price × Units sold − Variable cost per unit × Units sold − Fixed costs = 0

This rearranges the relationship behind the SBA's break-even formula: sales must cover fixed and variable costs. Use costs and units for the same period, and define which costs the result covers.

The denominator is units sold, rather than units produced or warehouse capacity. Unsold production does not generate the revenue needed to cover the period's costs. If you already know the selling price and need a required sales volume, use the separate break-even analysis method.

For this example, the scope is monthly operating break-even for one product line. Interest, income taxes, and recovery of the original investment are outside the calculation. A business can meet this operating price and still need additional cash for financing or expansion.

Take the inputs from revenue and cost exports

An illustrative US distributor sells maintenance kits. Its September export contains one product line, with all amounts in USD. Fixed costs belong entirely to this line; no shared costs need allocating.

Export input Quantity or amount (USD unless units stated) Treatment
Net units sold 3,000 units Sold units after returns
Net revenue 69,000 After discounts; excludes sales tax
Kit contents 24,000 Variable cost
Assembly 6,000 Variable cost
Outbound handling 6,000 Variable cost
Supervision 14,000 Fixed monthly cost
Warehouse occupancy 10,000 Fixed monthly cost
Product support 6,000 Fixed monthly cost

Retain transaction date, product, quantity, net revenue, cost account, and department on the underlying rows. Match cost entries to the same sold units and month. An invoice register supplies realized selling prices; a purchasing export alone will not establish the cost of units sold when inventory changes.

Classify costs by their behavior over the relevant volume range. Assembly is variable in this example because it is purchased per kit. A salaried assembly team might instead create a fixed cost or a capacity step. Preserve that distinction before comparing scenarios.

Work each step and prove the result

The following calculations use the export inputs above. No rounding is required for this base case.

Step Calculation Result (USD)
Total variable cost (USD) 24,000 + 6,000 + 6,000 36,000
Variable cost per unit (USD) 36,000 / 3,000 12.00
Total fixed cost (USD) 14,000 + 10,000 + 6,000 30,000
Fixed cost per unit (USD) 30,000 / 3,000 10.00
Breakeven price (USD) 12.00 + 10.00 22.00
Revenue at breakeven (USD) 3,000 × 22.00 66,000
Total included cost (USD) 36,000 + 30,000 66,000
Operating result at breakeven (USD) 66,000 − 66,000 0

The current realized price is $69,000 / 3,000 = $23.00. Current operating profit is $69,000 − $36,000 − $30,000 = $3,000. That surplus is also the $1.00 difference between realized and breakeven price multiplied by 3,000 units.

Check both identities. First, revenue at the required price equals total included cost. Second, contribution at that price is ($22.00 − $12.00) × 3,000 = $30,000, exactly covering fixed costs. Tie the source totals back to the revenue ledger and the mapped expense accounts before accepting either result.

Compare prices at different volumes

Keep variable cost at $12.00 per kit and monthly fixed costs at $30,000. Change only sold volume.

Units sold Variable costs (USD) Fixed costs (USD) Total costs (USD) Breakeven price (USD)
2,000 24,000 30,000 54,000 27.00
3,000 36,000 30,000 66,000 22.00
4,000 48,000 30,000 78,000 19.50

The required price falls as fixed costs spread across more units. Each row reconciles: units multiplied by breakeven price equals total costs. These are conditional results; the table does not establish that customers will buy the assumed volume at the corresponding price.

Check capacity separately. If the higher volume requires another shift or warehouse space, revise fixed costs before quoting the lower price. Finance should own the cost scope, while sales owns the evidence for achievable volume. Compare realized prices with approved prices using price realization by customer.

Account for fees charged as a percentage of sales

A percentage selling fee changes with price. Adding its current dollar amount to variable cost will understate the fee when the selling price rises.

Breakeven price with a percentage fee = (Variable unit cost excluding fee + Fixed costs / Units) / (1 − Fee rate)

Fee scenario input or check Value (USD unless units stated)
Units sold 3,000
Variable unit cost excluding fee (USD) 12.00
Fixed costs (USD) 30,000
Fee rate on revenue 3.0%
Exact required price (USD) 22 / 0.97 = 22.680412…
Price rounded upward to cents (USD) 22.69
Revenue at rounded price (USD) 68,070.00
Fee at rounded price (USD) 2,042.10
Remaining operating profit (USD) 68,070 − 2,042.10 − 36,000 − 30,000 = 27.90

In Excel, put units in B2, variable unit cost excluding the fee in B3, fixed costs in B4, and fee rate in B5:

=IF(OR(B2<=0,B5<0,B5>=1),"Check inputs",ROUNDUP((B3+B4/B2)/(1-B5),2))

Microsoft documents that ROUNDUP rounds away from zero. For a positive required price, rounding upward avoids a small shortfall. Covirage is not affiliated with Microsoft.

Where it goes wrong

  • An optimistic volume denominator. Dividing fixed costs by capacity rather than supported sales makes the required price look easier to achieve.
  • Double-counted fixed overhead. A standard unit cost may already contain absorbed overhead. Separate that allocation before adding the same fixed expense pool again.
  • Gross prices compared with net costs. Discounts, rebates, and returns reduce retained revenue. Compare the result with net realized price on a consistent unit basis.
  • A price calculation treated as a recovery date. Covering this month's costs does not recover startup spending. Break-even time separates operating results from cumulative cash payback.

Compare required prices on your own file in Covirage

Bring a product sales export and the corresponding cost workbook, with planned volumes and cost assumptions identified. Covirage maps the columns, its tools compute and check the figures, and the external AI model explains the results with every figure traced to its rows. Create a free Covirage account, which takes about a minute, then set up your business and bring a sample of your own data.

See customer profitability analysis for the related business use.

Questions people ask

Is breakeven price the same as a minimum acceptable quote?

It is a full cost reference at the volume and cost scope you selected. A quote decision also depends on capacity, incremental costs, alternative orders, and commercial terms. State whether the analysis covers one order, a product line, or the entire business.

Should breakeven price include sales tax?

Use revenue retained by the business. Keep sales tax collected for a taxing authority outside the selling price used in the calculation. Check the export because a customer invoice total may include amounts that are liabilities rather than revenue.

What happens when planned sales volume is zero?

There is no finite unit price that recovers fixed costs through zero sales. Flag the scenario instead of replacing the division error with zero. Revisit whether the business will sell anything during the period and whether the fixed costs remain committed.

Can one breakeven price be used across several products?

Only with an explicit sales mix and a defensible allocation of shared costs. Different products consume different resources and earn different contributions. Keep product calculations separate, then reconcile the contributions and fixed costs to the business total before using an average price.