Free Excel contracting-entity mapping workbook with synthetic examples, editable inputs, live formulas and clear review states.
Free Excel workbook, no sign-up. The formulas are live, and sample rows show how it fills in: replace them with your own.
Download contracting-entity-mapping.xlsx
Filled it in with your own figures? Upload the workbook to Covirage: it maps your columns and checks the totals, free, in your browser.
| Mapping ID | Customer ID | Site ID | Contracting entity ID | Parent ID | Agreement ID | Effective from | Effective to | Evidence reference | Mapping status |
|---|---|---|---|---|---|---|---|---|---|
| EM-01 | C-601 | SITE-01 | ENT-01 | GROUP-01 | AG-01 | 1/1/2026 | 12/31/2026 | EV-01 | Active |
| EM-02 | C-602 | SITE-02 | ENT-02 | GROUP-01 | AG-02 | 1/1/2025 | 12/31/2025 | EV-02 | Out of period |
| EM-03 | C-603 | SITE-03 | ENT-03 | GROUP-02 | AG-03 | 1/1/2026 | 12/31/2026 | EV-03 | Overlap |
| EM-04 | C-603 | SITE-03 | ENT-04 | GROUP-02 | AG-03 | 6/1/2026 | 5/31/2027 | EV-04 | Overlap |
| EM-05 | C-604 | SITE-04 | GROUP-02 | AG-04 | 1/1/2026 | 12/31/2026 | EV-05 | Incomplete |
This contracting-entity mapping workbook gives analysts a dated crosswalk between customer, site, signing entity, parent and agreement IDs. It keeps the legal-entity role separate from the parent group and exposes ambiguous time ranges. Live formulas identify active unambiguous records, overlaps and missing fields for a fixed as-of date. The existing hierarchy guide remains the explanation of why those levels differ.
Enter a stable mapping ID, customer ID, site ID, contracting-entity ID, parent ID, agreement ID, inclusive effective-from and effective-to dates, and evidence reference. B4 controls the analytical as-of date. The sample key is site plus agreement, with one contracting entity in force per date. Use a more detailed key if product-specific agreements or other authorized structures require one.
Keep the amber inputs separate from the pale blue calculation columns. The worksheet has 20 prefilled detail rows, from 13 through 32. If you need more records, extend every affected formula and summary range together, then check a first, middle and final row. Save a dated working copy before replacing the sample.
EM-01 is active on October 6, 2026. EM-02 ended in 2025. EM-03 and EM-04 both cover SITE-03/AG-03 during overlapping periods, so neither is treated as an active unambiguous record. EM-05 has no contracting entity. The sample therefore has one active record, two overlap exceptions and one incomplete record. Closing EM-03 on May 31 removes the overlap without deleting its history.
Mapping status checks identifier uniqueness, required fields and chronological dates. It then counts rows with the same site/agreement whose intervals overlap the current row’s interval. Only a complete, nonoverlapping record covering B4 becomes Active. Out-of-period rows remain available for historical use. The summary reports record counts rather than claiming a distinct customer or group count.
This is an analytical crosswalk, not a legal-entity verification service. A complete ID does not prove signatory authority, common ownership or a right to combine customer data. Resolve those points with the responsible owner and supporting evidence. The workbook does not join invoices, change CRM records or recalculate concentration automatically. Preserve source keys and the definition of the economic relationship when the mapping feeds a later report.
For the underlying method, read account hierarchy parents and subsidiaries. sold to bill to ship to covers the adjacent question. If you want to review the required fields and one reporting output, discuss your setup. Views depend on your records and agreed definitions.
No. Every identifier, amount and policy choice in the sample is synthetic. Replace the sample before using the workbook for your own review.
Edit the amber input cells. Keep the pale blue calculated columns and summary formulas. The prefilled detail area supports rows 13 through 32; extend formulas and summary ranges together for a larger file.
No. It is a manual Excel workbook. If you want to discuss recurring reporting, bring one question and the relevant file structure to Covirage.