Tenders refused over tenders offered, per lane per week, from the broker's own tender log, against each lane's baseline. It rises weeks before spot rates do. The cost per rejection is the cover rate less the contracted rate, and the rising lanes are the shipper conversation before the lane goes to spot.
The index says the nation tightened. The log says which lane, which carrier, what cost, this week.
A lane looks tight when one carrier has repriced.
Tenders refused divided by tenders offered, per lane per week, against each lane's own history.
A lane's rejection rate rose from 8 to 30 percent over six weeks. The shipper's system has begun routing to the next carrier first.
Seen as an operations number. Each rejection teaches the shipper to call someone else.