Sign in

Glossary

Primary tender share

The share of a shipper's loads on a lane tendered to the broker first, from the routing guide where shared or inferred from tender timing. A backup position that accepts nearly everything it sees, on time, is the case for primary; a primary position that rejects is a lane about to be lost.

DefinitionThe share of a shipper's loads on a lane tendered to the broker first, from the routing guide where shared or inferred from tender timing. A backup position that accepts nearly everything it sees, on time, is the case for primary; a primary position that rejects is a lane about to be lost.

Volume is not position

Fifty loads a month as third in the guide are the loads two others refused.

The case, per lane

Broker's acceptance and on-time, and the incumbent's rejection rate from the shipper's own data.

How it is computed

Tenders received as the first offer divided by tenders received, by shipper and lane, from the tender log's sequence or the routing guide.

Example

On a shipper's tenders the broker was first call on 40 percent and second or third on 60. Backup freight is irregular and harder to cover.

Where it goes wrong

Being on the routing guide counted as winning the lane.