The rows that failed a check, with the check, the value and the owner: an account under two reps, a split summing to 1.4, a claim with no policy, an invoice with no contract price. Produced on every load, worked to a deadline, and never silently adjusted.
A failed identity is a list of rows. A total that is "off by $41,000" is not actionable; three duplicated lines are.
Unresolved at the deadline: excluded from the run, and the owner told.
Every check that fails produces a row: the record, the check, the value found and the owner. The list is worked until empty, and tables that depend on a failed check are held back.
This week: 14 accounts assigned to two reps, 3 invoice lines whose credit splits sum to 1.2, and 41 open deals with a close date in the past.
Failures logged and not owned. The list grows, people stop reading it, and the checks might as well not run.