Sign in

Blog · Data quality and reconciliation

Ten questions a head of sales operations asks, and the check that answers each

The ten questions a head of sales operations asks before anything is reported, does the CRM reconcile to the ledger, does every account have one owner, do the territories' quotas sum to the target, are the splits summing to one, is the pipeline clean, has any identifier drifted, which reps' data can be believed, did the definitions change, did the export match its control total, and what is on the exception list, each with the check that answers it, the identity behind it, and why sales operations owns the checks that everyone else's numbers rest on.

The short answerA head of sales operations owns the checks that every other leader's numbers rest on, and each question is a check with an identity: CRM accounts reconcile to the ledger's customers; every active account has exactly one owner on the date; territory quotas sum to the company target; splits sum to one per line with overlays apart; the pipeline passes the five hygiene checks; no identifier vanished or appeared past the threshold; each rep's data quality score is above the floor; the definition version is unchanged or the change is noted; each export matched its control total; and the exception list is worked to its deadline. When the ten hold, the CRO's lists and the CFO's tables are built on something.

Every leader's numbers rest on ten checks that sales operations owns. If the checks hold, the lists and the tables mean something; if they do not, nobody's numbers do. This guide is the ten questions a head of sales operations asks, the check for each, and what happens when one fails.

The ten

# The question The check Identity On failure
1 Does the CRM reconcile to the ledger? Five mismatch types, listed Attributed revenue equals ledger Unowned revenue listed; coverage greyed for affected reps
2 Does every account have one owner? Assignment check on the date Exactly one owner per active account Double-owned accounts excluded and listed
3 Do the quotas sum to the target? Territory quota identity, after moves Σ quotas = target Plan flagged; attainment not computed
4 Do the splits sum to one? Crediting identity; overlay apart Σ shares = 1 per line Lines listed before the commission run
5 Is the pipeline clean? Five hygiene checks Open pipeline = clean + flagged Flagged share shown on every forecast
6 Has any identifier drifted? Vanished, appeared, paired, threshold Map applied before measures Run stopped past threshold; pairs proposed
7 Whose data can be believed? Data quality score per rep Passing ÷ records Dependent measures greyed under the floor
8 Did the definitions change? Version on every table Version matches or the change is noted Movements flagged as definition changes
9 Did the export match its control total? Validation line 2 File total = source total Upload rejected or marked unreconciled
10 What is on the exception list? All failures, with owner and deadline Every failure is a line Unresolved at deadline: excluded and told

The order

Nine first: if the export is wrong, nothing after it matters. Then six, because a re-keyed base breaks everything. Then one and two, the book. Then three and four, the plan and the credit. Then five, seven and eight. Then ten, which is the list of everything that failed.

A worked Monday

Check Result
9 Ledger $4,182,400 = control; CRM activities 48,211 = control. Pass
6 3 new accounts, 1 rep re-keyed (R-19 → R-04), mapped. Pass
1 210 ledger customers with no CRM owner, $1.9m. Listed; coverage greyed for the region
2 2 accounts with two owners. Excluded, listed
3 Σ quotas $14.0m = target after two moves. Pass
4 2 lines with splits at 1.4. Listed for the commission run
5 36% of weighted forecast flagged. Shown on the forecast
7 R-04 at 41%; coverage and untouched greyed for R-04
8 v2026.3, unchanged. Pass
10 7 items, 3 owners, deadline Thursday

Ten lines, five minutes, and the head of sales operations knows exactly which of the CRO's lists to trust this week.

Where it goes wrong

Checks run by nobody. Every leader's numbers rest on nothing.

Failures fixed in the report. The source is still wrong next month.

Check nine skipped. A half-month export analyzed as whole.

No exception list. The failures are known and unowned.

Every upload, ten checks

Covirage runs the ten on every upload and produces the exception list with owners. The metrics governance solution describes the setup, and the validation report guide covers the six lines the first checks are read from.

Questions people ask

Why does sales operations own these?

Because they are about the data, not the sales result, and the person who runs the CRM, the assignments and the quota file is the one who can fix a failure. The CRO reads the lists; sales operations makes sure the lists are built on a book that reconciles.

How long do the ten take?

Minutes, when they are computed on every upload. The first time, a week, because the failures are discovered. After that, the checks run, the exception list is short, and the head of sales operations reads ten lines on Monday before anyone else reads anything.

What happens when one fails?

The dependent measures are greyed or suppressed and the failure is on the exception list with an owner and a deadline. A coverage figure on a rep whose accounts have two owners is not shown as a coverage figure; it is shown as a check that failed.