Blog · Finance metrics and formulas · Finance and FP&A teams
WACC analysis combines supplied debt and equity costs using their capital weights. Work through a transparent business funding example, reconcile the weighted rate, and compare changes in approved assumptions.
WACC analysis explains how a business's debt cost, equity cost, and funding mix combine into its weighted average cost of capital. It starts with supplied finance assumptions, not an interest expense total. A useful review shows the contribution of each funding source and the checks behind the combined rate.
Debt providers require compensation for lending, and equity providers require a return for bearing ownership risk. WACC combines those costs according to their proportions in the business's capital structure. It is an economic funding benchmark rather than a bill the company pays each year.
The NYU Stern notes on discount-rate inputs define WACC using the costs of financing components and their market-value weights. They also distinguish the after-tax cost of debt from the cost of equity.
This example uses only debt and common equity. If the funding workbook includes preferred equity or another separately priced capital source, include its approved cost and weight rather than forcing it into the common-equity line.
WACC = Equity weight × Cost of equity + Debt weight × Pretax cost of debt × (1 - Assumed tax rate)
Debt weight = Debt capital value / Total capital value
Equity weight = Equity capital value / Total capital value
The weights describe shares of capital, not shares of revenue or operating expense. A debt-to-equity ratio compares the same funding categories differently and does not replace those weights.
Start with an approved capital schedule and an assumptions sheet. Keep the entity, currency, valuation date, value basis, annual cost, tax treatment, and assumption owner visible. Debt and equity values must describe the same business boundary at the same date.
Use supplied current cost assumptions appropriate to the question. Historical interest expense divided by closing debt can mix periods, fees, average balances, and old borrowing terms. The equity cost is a required return assumption, not an accounting expense or the dividend rate.
For conventional WACC, use supplied market-value weights. If a private business uses approved target weights or an internal proxy, label that basis and its limits. Do not silently present a book-equity balance as a current market value.
The wider capital structure ratios review addresses leverage measures; this calculation focuses on how the chosen capital weights combine with funding costs.
A US equipment manufacturer supplies the following capital assumptions as of October 23, 2026. Values are approved estimates on a consistent basis for this illustration. The 25.0% tax rate is a supplied planning assumption, not a statement of the company's statutory tax rate or a tax calculation.
| Funding source | Capital value (USD) | Supplied annual cost | Assumed tax rate | Cost after assumed tax adjustment |
|---|---|---|---|---|
| Debt | 4,000,000 | 6.0% | 25.0% | 6.0% × (1 - 25.0%) = 4.5% |
| Common equity | 6,000,000 | 12.0% | Not applied | 12.0% |
| Total capital | 10,000,000 |
The assumed adjustment applies to debt only. Equity's required return remains 12.0%. Calculate each capital weight and multiply it by its applicable cost:
| Step | Calculation | Result |
|---|---|---|
| Debt weight | 4,000,000 / 10,000,000 | 40.0% |
| Equity weight | 6,000,000 / 10,000,000 | 60.0% |
| Debt contribution | 40.0% × 4.5% | 1.8 percentage points |
| Equity contribution | 60.0% × 12.0% | 7.2 percentage points |
| WACC | 1.8% + 7.2% | 9.0% |
For a spreadsheet with Capital value in B, Supplied cost in C, and Assumed tax rate in D, place debt on row 2 and equity on row 3. Use these formulas for the respective contributions and total:
=B2/SUM($B$2:$B$3)*C2*(1-D2)
=B3/SUM($B$2:$B$3)*C3
=SUM(E2:E3)
The first two formulas belong in E2 and E3. Format results as percentages. This example displays rates to one decimal place and retains unrounded values in the calculations.
Multiply each capital value by its applicable annual cost. This converts the weighted-rate arithmetic into a dollar reconciliation:
| Check | Calculation | Annual equivalent (USD) |
|---|---|---|
| Pretax debt cost | 4,000,000 × 6.0% | 240,000 |
| Assumed tax reduction | 240,000 × 25.0% | 60,000 |
| Debt cost after assumed reduction | 240,000 - 60,000 | 180,000 |
| Required equity return | 6,000,000 × 12.0% | 720,000 |
| Combined equivalent charge | 180,000 + 720,000 | 900,000 |
The identity is $900,000 / $10,000,000 = 9.0%. Also check that the weights total 100.0% and that each capital value ties to the approved schedule. The equivalent equity charge is not a promised dividend or a cash payment forecast.
The tax benefit needs separate review. The IRS guidance on business interest expense limitations explains that deductions may be limited. The tax owner must confirm whether the simplified assumed reduction is usable; the WACC formula does not establish eligibility.
Change one input at a time to understand the result. Keep the capital values and the assumed tax rate from the first table:
| Scenario | Debt cost before tax | Equity cost | Calculation | WACC |
|---|---|---|---|---|
| Base | 6.0% | 12.0% | 40% × 6% × 75% + 60% × 12% | 9.0% |
| Higher debt cost only | 8.0% | 12.0% | 40% × 8% × 75% + 60% × 12% | 9.6% |
| Higher equity cost only | 6.0% | 14.0% | 40% × 6% × 75% + 60% × 14% | 10.2% |
These are sensitivity cases, not predictions. Treasury owns borrowing assumptions and capital values; the CFO or delegated finance owner approves equity assumptions and the intended use; tax reviews the debt adjustment. FP&A reconciles the workbook and explains what changed.
WACC may inform a capital planning discussion, but the appropriate benchmark also depends on project risk and cash-flow definitions. Use capital budgeting cash flow analysis for the project cash-flow work rather than treating this funding table as an investment recommendation.
Upload a sample of your own capital schedule and supplied cost assumptions to Covirage. Covirage maps the columns, and its tools compute and check the underlying workbook figures; the external AI model explains the comparisons with every figure traced to its rows. Create a free Covirage account and bring a sample of your own data.
See Covirage for finance teams for the supporting workflow.
No. A borrowing rate applies to debt financing. WACC also includes the required return on equity, weighted by equity's share of the capital structure. The debt component may include an assumed tax benefit, subject to whether that benefit is available to the business.
The conventional WACC framework uses market-value capital weights. An internal workbook may use approved target weights or a disclosed book-value proxy, but those choices need clear labels. Do not combine one basis for debt with another for equity without an explicit finance policy.
Deductible interest can reduce taxable income, lowering the effective cost of debt. The simplified calculation assumes the deduction can be used at the supplied tax rate. Interest limitations, losses, timing, or the entity's tax treatment can make that assumption inappropriate.
A lower calculated rate describes the supplied assumptions, not the full financing decision. Additional borrowing may change risk, lender terms, equity expectations, liquidity, and covenant capacity. Finance must evaluate those effects rather than holding every other input fixed and treating the arithmetic as approval.