Sign in

Glossary

Percentage point

The arithmetic difference between two percentages, as distinct from the percentage change between them.

DefinitionThe arithmetic difference between two percentages, as distinct from the percentage change between them.

A percentage point is the unit for the difference between two percentages. When a margin, a rate or a share moves, the change can be stated two ways: in percentage points, by subtracting one percentage from the other, or as a percentage change, relative to the starting value. They answer different questions and are often confused.

How it is computed

Change in percentage points = new percentage − old percentage. Percentage change = (new − old) ÷ old. In Excel, with the rates in B2 and C2: =C2-B2 formatted as a number for points, =(C2-B2)/B2 for the relative change.

Example

Gross margin rises from 20% to 25%. That is an increase of 5 percentage points, and a percentage increase of 25%, because 5 ÷ 20 = 0.25.

Where it goes wrong

Writing "margin up 5%" when it rose 5 points, which a reader takes to mean 20% to 21%. Formatting a point difference as a percentage in a spreadsheet, so 0.05 displays as 5% and looks like a relative change. The full guide is percentage change in Excel.