Sign in

Templates

Wallet-evidence refresh log

Free Excel wallet-evidence refresh log with synthetic examples, editable inputs, live formulas and clear review states.

The short answerA wallet estimate can remain numerically plausible after its evidence becomes old. This wallet-evidence refresh log makes the next review date and the person responsible visible. Its live formulas separate evidence that is current, due, pending, rejected or incomplete. Use it as a small maintenance record beside the account analysis, rather than overwriting the source label whenever a new figure arrives.

Download the template

Free Excel workbook, no sign-up. The formulas are live, and sample rows show how it fills in: replace them with your own.

Download wallet-evidence-refresh-log.xlsx

  • Evidence refresh: Editable source inputs and the live summary and review calculations

Filled it in with your own figures? Upload the workbook to Covirage: it maps your columns and checks the totals, free, in your browser.

Preview: Evidence refresh

Customer IDCategoryEvidence referenceRecorded dateReview interval (days)Last reviewedUpdated wallet (USD)DispositionOwnerNext review dateRefresh status
C-301MROW-3015/1/2026907/1/2026PendingOwner A9/29/2026Due
C-302ITW-3029/1/2026909/30/2026$180,000ConfirmedOwner B12/29/2026Current
C-303MROW-3039/2/202630PendingOwner C10/2/2026Due
C-304ITW-3049/15/2026609/30/2026RejectedOwner A11/29/2026Rejected
C-305MROW-3059/30/202690$220,000Updated12/29/2026Incomplete

A wallet estimate can remain numerically plausible after its evidence becomes old. This wallet-evidence refresh log makes the next review date and the person responsible visible. Its live formulas separate evidence that is current, due, pending, rejected or incomplete. Use it as a small maintenance record beside the account analysis, rather than overwriting the source label whenever a new figure arrives.

What to enter

Record the customer/category, evidence reference, recorded date, review interval in days, last review, any updated wallet amount, disposition and owner. The interval is your team’s policy input, not an industry benchmark. B4 is a fixed as-of date. Changing that date updates the due population without altering historical source dates. Keep evidence references brief and store the supporting documents in your own records.

Use the workbook

  1. Enter the source date and an agreed review interval for each wallet record. Assign an owner while the evidence is still usable.
  2. Set B4 to the date of the review. Work the Due and Incomplete rows before treating the existing estimate as current.
  3. Record the review date and disposition. Preserve an updated amount with its new evidence reference, and retain superseded evidence outside this working log.

Keep the amber inputs separate from the pale blue calculation columns. The worksheet has 20 prefilled detail rows, from 13 through 32. If you need more records, extend every affected formula and summary range together, then check a first, middle and final row. Save a dated working copy before replacing the sample.

The synthetic example

C-301 was last reviewed on July 1 with a 90-day interval, so its next review was September 29. On October 6 it is Due. C-302 was reviewed September 30 with a 90-day interval and is Confirmed, so it is Current. C-303 is overdue, C-304 is Rejected, and C-305 lacks an owner. The sample shows two due records and only one current record.

How the results update

Next review date is the later of the recorded date and last-reviewed date, plus the review interval. A missing or nonpositive interval produces n.a. rather than an artificial date. Disposition and ownership are separate prerequisites: extending the date while leaving Pending does not make a record Current. The top counts read these row statuses and update when the date, interval or review outcome changes.

Limits and a useful next step

Current means reviewed under the stated cadence; it does not mean the wallet was independently observed. A seasonal business, acquisition or major customer change may require an earlier review than the interval suggests. The workbook does not collect source documents, notify owners or revise a downstream report automatically. Decide those responsibilities before using the log for recurring reporting.

For the underlying method, read stated and estimated. how often should sales data be refreshed covers the adjacent question. If you want to review the required fields and one reporting output, discuss your setup. Views depend on your records and agreed definitions.

Questions people ask

Is the sample real customer data?

No. Every identifier, amount and policy choice in the sample is synthetic. Replace the sample before using the workbook for your own review.

Which cells should I change?

Edit the amber input cells. Keep the pale blue calculated columns and summary formulas. The prefilled detail area supports rows 13 through 32; extend formulas and summary ranges together for a larger file.

Does this download connect to my systems?

No. It is a manual Excel workbook. If you want to discuss recurring reporting, bring one question and the relevant file structure to Covirage.