Free Excel sales-plan assumptions register with synthetic examples, editable inputs, live formulas and clear review states.
Free Excel workbook, no sign-up. The formulas are live, and sample rows show how it fills in: replace them with your own.
Download sales-plan-assumptions-register.xlsx
Filled it in with your own figures? Upload the workbook to Covirage: it maps your columns and checks the totals, free, in your browser.
| Assumption ID | Driver | Scenario label | Lower value | Active value | Upper value | Evidence reference | Evidence date | Owner | Review date | Approval | Review status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| AS-01 | Retention rate | Base | 0.85 | 0.9 | 0.95 | EV-01 | 9/30/2026 | Owner A | 12/1/2026 | Approved | Current |
| AS-02 | New-business win rate | Base | 0.2 | 0.35 | 0.4 | EV-02 | 9/30/2026 | Owner B | 10/1/2026 | Approved | Review due |
| AS-03 | Expansion rate | Base | 0.05 | 0.12 | 0.1 | EV-03 | 9/30/2026 | Owner A | 12/1/2026 | Pending | Outside range |
| AS-04 | Sales FTE | Base | 14 | 18 | 20 | Owner C | 11/1/2026 | Pending | Incomplete |
A sales plan often contains several plausible numbers with no clear owner or evidence date. This assumptions register keeps each active planning input beside its range, source and approval. The live status highlights values outside their stated bounds, assumptions awaiting approval and approved inputs whose review date has passed. It documents planning assumptions without redefining the sales metrics themselves.
Record an assumption ID, driver name, scenario label, lower/active/upper values, evidence reference and date, owner, review date and approval. Include the unit in the driver name where it is not obvious. Rates are decimals in the sample, so 0.90 is 90%. Sales FTE is a count. The descriptive scenario label says where the assumption is used; it is not an active-case switch for another model.
Keep the amber inputs separate from the pale blue calculation columns. The worksheet has 20 prefilled detail rows, from 13 through 32. If you need more records, extend every affected formula and summary range together, then check a first, middle and final row. Save a dated working copy before replacing the sample.
AS-01 has a 0.90 retention assumption within 0.85–0.95, supporting evidence and a December review date, so it is Current. AS-02 is approved but its October 1 review date is past. AS-03’s 0.12 active expansion rate exceeds its 0.10 upper bound. AS-04 has no evidence. Only one of the four sample assumptions is both approved and current.
Review status tests required input fields first, then lower/active/upper consistency, then approval and review date. A missing source stays Incomplete even if someone chooses Approved. An out-of-range value remains visible rather than being silently capped. The summary counts these states. Updating an active value, evidence field, approval or date recalculates the status in the same row.
The worksheet does not determine a statistically justified range or predict whether an assumption will hold. It does not connect approved values to an external planning platform. Keep actual history separate from proposed drivers, and record a new version when you change the basis. If your model requires a case selector, define and test that selector in the model rather than treating this register’s scenario labels as live model controls.
For the underlying method, read sales planning. versioned metric definitions covers the adjacent question. If you want to review the required fields and one reporting output, discuss your setup. Views depend on your records and agreed definitions.
No. Every identifier, amount and policy choice in the sample is synthetic. Replace the sample before using the workbook for your own review.
Edit the amber input cells. Keep the pale blue calculated columns and summary formulas. The prefilled detail area supports rows 13 through 32; extend formulas and summary ranges together for a larger file.
No. It is a manual Excel workbook. If you want to discuss recurring reporting, bring one question and the relevant file structure to Covirage.