Free Excel procurement category-mapping workbook with synthetic examples, editable inputs, live formulas and clear review states.
Free Excel workbook, no sign-up. The formulas are live, and sample rows show how it fills in: replace them with your own.
Download procurement-category-mapping.xlsx
Filled it in with your own figures? Upload the workbook to Covirage: it maps your columns and checks the totals, free, in your browser.
| Invoice ID | Supplier ID | Description | Amount (USD) | Proposed category | Evidence reference | Reviewed by | Approved date | Mapping status | Mapped amount (USD) |
|---|---|---|---|---|---|---|---|---|---|
| INV-01 | SUP-01 | Laptop devices | $25,000 | IT | MAP-01 | Owner A | 10/1/2026 | Mapped | $25,000 |
| INV-02 | SUP-02 | Building maintenance | $18,000 | Facilities | MAP-02 | Owner B | 10/2/2026 | Mapped | $18,000 |
| INV-03 | SUP-03 | Advisory project | $42,000 | Unmapped | $0 | ||||
| INV-04 | SUP-04 | Campaign production | $12,000 | Marketing | MAP-04 | Owner C | Pending review | $0 | |
| INV-05 | SUP-05 | Replacement parts | $9,000 | Parts | MAP-05 | Owner A | 10/3/2026 | Unknown category | $0 |
This procurement category-mapping workbook documents how an invoice receives an approved analytical category. It keeps the original description beside the proposed taxonomy label, evidence and human approval. The live summary separates mapped spending from unresolved spending. It is designed for the classification work that comes before a spend cube, rather than duplicating the analysis performed on completed categories.
The working table contains invoice ID, supplier ID, original description, amount in USD, proposed category, evidence reference, reviewer and approval date. The accepted taxonomy is in N13:N17. Use one invoice line per unique key; for a real invoice with several lines, use a line-level ID. Retain the original text so a reviewer can see what evidence led to the classification.
Keep the amber inputs separate from the pale blue calculation columns. The worksheet has 20 prefilled detail rows, from 13 through 32. If you need more records, extend every affected formula and summary range together, then check a first, middle and final row. Save a dated working copy before replacing the sample.
Two sample invoices are approved: $25,000 IT and $18,000 facilities. A $42,000 consultancy line has no category, a $12,000 marketing line lacks approval, and $9,000 of parts uses a label outside the taxonomy. Total spending is $106,000, mapped spending $43,000 and unresolved spending $63,000. Changing Parts to the approved MRO label completes that row when its evidence and approval remain present.
A duplicate invoice key is flagged first. A blank label is Unmapped; an unmatched taxonomy label is Unknown category. An accepted category still needs supplier, amount, evidence, reviewer and date before becoming Mapped. Mapped amount is the original amount only for those complete rows. The unresolved amount is total recorded spending less mapped spending, preserving visibility of the work still outstanding.
A formula can verify that a category appears in a taxonomy and that approval fields exist. It cannot determine whether the label is economically correct. Negative credit lines require a consistent source policy and line keys, and currency conversion happens before the USD inputs. This download does not infer categories with AI, amend an ERP or perform supplier deduplication. Keep the reviewed crosswalk and its version when you refresh a spend report.
For the underlying method, read spend under management. product taxonomy for analytics covers the adjacent question. If you want to review the required fields and one reporting output, discuss your setup. Views depend on your records and agreed definitions.
No. Every identifier, amount and policy choice in the sample is synthetic. Replace the sample before using the workbook for your own review.
Edit the amber input cells. Keep the pale blue calculated columns and summary formulas. The prefilled detail area supports rows 13 through 32; extend formulas and summary ranges together for a larger file.
No. It is a manual Excel workbook. If you want to discuss recurring reporting, bring one question and the relevant file structure to Covirage.