Sign in

Blog · Territory, capacity and quota planning

Sales coverage and sales capacity: two plans that have to agree

Why the coverage model, which says which accounts each rep touches at what cadence, and the capacity plan, which says how many touches each rep can make, are the same arithmetic from two ends, how to check that they agree, the identity that touches required equal touches available within a stated tolerance, the two ways they usually disagree, cadence set without hours and hours set without accounts, and the reconciliation that fixes both.

The short answerThe coverage model says each rep should touch each account at its tier's cadence. The capacity plan says each rep has a number of touch hours a month. Multiply accounts by cadence by minutes per touch and you have touches required; multiply reps by available hours and you have touches available. The two must agree within a stated tolerance, per rep, or one of them is fiction. They usually disagree because cadence was set in a workshop without hours, or headcount was set from revenue without accounts. The reconciliation is one table per rep: required, available, and the gap in hours.

A sales organisation builds a coverage model and a capacity plan in different meetings and never puts them on the same page. One says each tier-one account gets six touches a quarter; the other says each rep has a hundred and twenty touch hours a month. Whether the two agree is arithmetic, and it usually does not. This guide sets out the identity, the two ways it breaks, and the reconciliation.

The two plans

Plan Says Set by
Coverage model Accounts per rep, tier per account, touches per tier per period Sales leadership
Capacity plan Reps, available hours per rep, minutes per touch Sales operations, finance

The identity

Touches required per rep = Σ accounts × tier cadence Touches available per rep = available hours × 60 ÷ minutes per touch Required ≈ available, within the stated tolerance

The rows you need

  • Assignments and tiers: account, rep, tier.
  • Cadence: tier, touches per period.
  • Roster: rep, available hours per period, from the capacity plan.
  • Touch duration: minutes per touch by tier, from the activity log's own history.

Rep identifiers only.

A worked reconciliation

Minutes per touch: tier one 45, tier two 30, tier three 15. Available: 120 hours a month per rep, 360 a quarter.

Rep Tier 1 accounts × 6 Tier 2 × 3 Tier 3 × 1 Hours required Hours available Gap
R-04 9 × 6 = 54 23 × 3 = 69 30 × 1 = 30 40.5 + 34.5 + 7.5 = 82.5 360 Under-loaded by 277
R-11 8 × 6 = 48 18 × 3 = 54 18 × 1 = 18 36 + 27 + 4.5 = 67.5 360 Under-loaded
R-22 30 × 6 = 180 60 × 3 = 180 80 × 1 = 80 135 + 90 + 20 = 245 360 Fits

On this cadence the reps have hours to spare, which says the cadence is too low or the touch duration too short. Raise tier one to twelve touches and tier two to six:

Rep Hours required Hours available Gap
R-04 165 360 Fits
R-22 490 360 Over by 130: cannot deliver

Now R-22 cannot deliver the coverage model. Either R-22's book moves, or the cadence on R-22's tier three accounts drops. The table says which by how much.

The two ways it breaks

Cadence without hours. A workshop sets touches per tier from what tier-one accounts deserve. Nobody multiplies. The coverage model is unachievable for the reps with large books, and coverage at cadence reads low for reasons that are not the rep's.

Hours without accounts. Headcount is set from revenue per rep. Nobody checks the accounts those reps would carry. The capacity plan has reps with nothing to touch and reps with too much.

Where it goes wrong

Never put on one page. Two plans, both approved, contradictory.

Tolerance unstated. Every rep is either over or under by some amount; nobody knows which matters.

Touch duration from a guess. The activity log has the real number.

Reconciled once. Re-tiering and hiring both move it.

Every plan cycle, one identity

Mapped once, the assignments, tiers, cadence, roster and touch durations produce required against available per rep and the gap in hours every cycle. Covirage builds this from the exports as they are. The capacity planning solution describes the setup, and the rep load guide covers the load figure the required side is built from.

Questions people ask

Which one is wrong when they disagree?

Usually the coverage model, because cadence is set by ambition. Six touches a quarter on tier one sounds right until sixty tier-one accounts times six touches times forty minutes is more hours than the rep has. The capacity plan has the hours; the cadence has to fit them, or the tiers have to move.

What is the tolerance?

Ten percent either way is a common band. A rep whose required touches exceed available by more than that cannot deliver the coverage model whatever they do; one whose available exceeds required by more is under-loaded, and the capacity plan is carrying headcount the coverage does not need.

How often is it checked?

At every plan cycle and every re-tiering, because both move the required side, and at every hiring or attrition event, because those move the available side. Monthly in a stable team; the identity is cheap to compute and expensive to ignore.