Sign in

Blog · Finance metrics and formulas · Banking

Bank debt-to-equity ratio: deposits and leverage

A bank debt-to-equity ratio depends on whether debt means all liabilities, borrowings alone or interest-bearing funding. Compare the definitions on the same bank balances, reconcile them to assets and equity, and explain the movement across quarters.

The short answerA bank debt equity ratio divides a stated debt balance by accounting equity. Including all liabilities captures deposits and operating liabilities; a borrowings-only version excludes them. These definitions can move in different directions, so name the numerator and use consistent reporting dates. Neither version is a regulatory capital ratio or a universal test of bank safety.

A bank debt equity ratio is defined debt divided by accounting equity, but the definition of debt decides what the figure means. Deposits are liabilities, yet a ratio restricted to borrowings excludes them. Label the numerator before comparing banks or reporting periods.

Start with the debt boundary

For a bank, an unlabeled debt-to-equity figure is incomplete. A finance team may want to understand the entire balance sheet supported by equity, the borrowings raised outside the deposit franchise, or all funding that pays interest. Each question needs a different numerator.

Total liabilities to equity = Total accounting liabilities / Total accounting equity

Borrowings to equity = Defined nondeposit borrowings / Total accounting equity

Interest-bearing funding to equity = (Interest-bearing deposits + Defined nondeposit borrowings) / Total accounting equity

Use these labels throughout the workbook. Calling all three simply debt-to-equity hides material differences. The general debt-to-equity ratio explains the wider corporate measure; the bank-specific task is to make deposit funding visible.

Interest-bearing deposits should not disappear merely because a report separates deposits from other borrowed money. The FFIEC's UBPR summary-ratio guide includes interest-bearing deposits alongside specified borrowings in its interest-bearing-funds measure. That supports keeping the funding categories explicit, although the period-end ratio here uses its own stated denominator.

The rows to export

Bring the period-end balance sheet, deposit classification report and borrowing schedule for the same legal entity. Each record needs a reporting date, account or instrument identifier, balance in USD, accounting classification and interest-bearing flag. Preserve the original account labels alongside any grouping used for analysis.

Use accounting equity that belongs to the same reporting perimeter as the liabilities. A bank subsidiary's liabilities cannot be divided by its holding company's equity. If common equity alone is the desired denominator, identify it as a different measure and reconcile the excluded equity components.

This example has no minority interests, lease liabilities or additional financing instruments. In an actual export, map those items explicitly instead of letting an unrecognized account fall out of the calculation. Include every accounting liability in the broad version, even when it is outside the narrower borrowing definition.

A bank worked across two quarter-ends

The following invented US bank reports balances at June 30 and September 30, 2026. Nondeposit borrowings comprise FHLB advances, federal funds purchased and repurchase agreements, and subordinated notes. All listed nondeposit borrowings pay interest. The other-liabilities balance contains operating accruals and does not enter the interest-bearing-funding numerator.

Export balance June 30 (USD) September 30 (USD)
Noninterest-bearing deposits 240,000,000 250,000,000
Interest-bearing deposits 560,000,000 590,000,000
FHLB advances 50,000,000 80,000,000
Federal funds purchased and repurchase agreements 30,000,000 40,000,000
Subordinated notes 20,000,000 20,000,000
Other liabilities 10,000,000 10,000,000
Accounting equity 90,000,000 110,000,000
Total assets, independent balance-sheet control 1,000,000,000 1,100,000,000

Build the numerator from those rows before calculating any ratio:

Step June 30 calculation (USD) September 30 calculation (USD)
Nondeposit borrowings 50,000,000 + 30,000,000 + 20,000,000 = 100,000,000 80,000,000 + 40,000,000 + 20,000,000 = 140,000,000
Interest-bearing funding 560,000,000 + 100,000,000 = 660,000,000 590,000,000 + 140,000,000 = 730,000,000
Total liabilities 240,000,000 + 660,000,000 + 10,000,000 = 910,000,000 250,000,000 + 730,000,000 + 10,000,000 = 990,000,000

The ratios are multiples, rounded to two decimal places. Calculate with unrounded balances and round only the displayed result.

Definition June 30 calculation September 30 calculation
Total liabilities / equity 910,000,000 / 90,000,000 = 10.11x 990,000,000 / 110,000,000 = 9.00x
Nondeposit borrowings / equity 100,000,000 / 90,000,000 = 1.11x 140,000,000 / 110,000,000 = 1.27x
Interest-bearing funding / equity 660,000,000 / 90,000,000 = 7.33x 730,000,000 / 110,000,000 = 6.64x

The broad ratio falls while borrowings to equity rises. Both results are correct. The bank has more equity relative to total liabilities, alongside more borrowing relative to that equity. A single unlabeled number would conceal this funding change.

The proof: reconcile to the accounting identity

The broad numerator must satisfy assets minus liabilities equals equity:

Control June 30 (USD) September 30 (USD)
Assets minus liabilities 1,000,000,000 - 910,000,000 = 90,000,000 1,100,000,000 - 990,000,000 = 110,000,000
Difference from reported equity 90,000,000 - 90,000,000 = 0 110,000,000 - 110,000,000 = 0

An additional identity checks the ratio presentation:

Assets / Equity = Total liabilities / Equity + 1

June gives 1,000,000,000 / 90,000,000 = 11.11x, matching 10.11x + 1 after rounding. September gives 1,100,000,000 / 110,000,000 = 10.00x, matching 9.00x + 1. This identity requires the complete accounting liability numerator; the borrowings-only ratio cannot pass it.

Explain what moved, then ask about funding

Separate the liability movement from the equity movement. Holding June equity fixed, September liabilities give 990,000,000 / 90,000,000 = 11.00x. The liability increase therefore adds 0.89x to the starting 10.11x. Replacing June equity with September equity brings the result from 11.00x to 9.00x, a reduction of 2.00x. This sequential bridge depends on the chosen order, which should stay consistent.

The resulting discussion belongs with finance and treasury. Finance reconciles equity movements to approved financial reporting. Treasury explains deposit changes, borrowing maturity and funding costs. Use loan-to-deposit ratio alongside this analysis to understand how lending relates to deposit funding, without treating deposits and borrowings as interchangeable.

Do not interpret accounting leverage as a regulatory capital result. The FFIEC capital-analysis guide separately identifies regulatory leverage and risk-based capital ratios from Schedule RC-R. The bank capital adequacy ratio covers that distinct reporting question. None of the example multiples establishes a universal acceptable threshold.

Where it goes wrong

  • Changing the deposit treatment. Including deposits in one quarter and excluding them in the next produces a definition change disguised as a trend.
  • Missing or duplicated borrowings. A subordinated note can appear in both a debt schedule and a balance-sheet export. Reconcile identifiers before adding sources together.
  • Mixing equity bases. Common equity, total accounting equity and regulatory capital have different boundaries. State which denominator was supplied.
  • Netting cash without changing the label. Subtracting cash creates a net debt-to-equity ratio, with additional questions about available bank cash. It is not the gross measure worked here.
  • Dividing by zero or negative equity. Report the condition and underlying balances for review. A negative multiple does not mean the institution has less leverage than one with positive equity.

Compare your bank balances in Covirage

Upload your balance-sheet export and classified deposit and borrowing schedules; Covirage maps the columns, and its tools compute the consistently defined ratios and check the balances. The external AI model explains the movements with every figure traced to its rows. Create a free Covirage account and bring a sample of your own data.

See Covirage for commercial banking teams for the banking context.

Questions people ask

Are deposits included in a bank's debt-to-equity ratio?

Deposits belong in a total-liabilities-to-equity calculation. A borrowings-only definition excludes them, while an interest-bearing-funding definition includes only deposits that pay interest. Show the deposit treatment next to the ratio so readers can compare the same measure across periods.

What is a good debt-to-equity ratio for a bank?

There is no universal ideal for an undefined bank debt-to-equity measure. Compare a consistent definition with the bank's history, funding strategy and comparable institutions. Review regulatory capital, asset quality and liquidity separately before drawing a broader conclusion.

Is debt-to-equity the same as the bank leverage ratio?

No. Accounting debt-to-equity puts defined liabilities or borrowings over accounting equity. A regulatory leverage ratio uses a specified capital numerator and exposure denominator. The two measures answer different questions and cannot be substituted for each other.