Sign in

Glossary

Movements page

The page of a reporting pack that lists every measure that moved past its stated threshold since the last period, each line citing the table and row it came from. It replaces the narrative; the other tables are evidence.

DefinitionThe page of a reporting pack that lists every measure that moved past its stated threshold since the last period, each line citing the table and row it came from. It replaces the narrative; the other tables are evidence.

Citation on every line

Commentary that does not cite a row is opinion, and the pack keeps it out.

Failed identities go here

A roll-up that did not reconcile is a movement, not a footnote.

How it is used

One page listing every measure that moved beyond its own threshold since the last period, with the size of the move, the place it occurred and a link to the rows. Measures that did not move are not mentioned.

Example

Of 42 measures, five moved: northern coverage down four points, dormant value up 12 percent, two reps' forecast bias, and price realization in one category.

Where it goes wrong

A pack that reports all 42 every month. The five that matter are on page nine.