Sign in

Glossary

Hard threshold

One of the few measures where the level, not the trend, is the finding: SLA attainment against a contracted target, a credit limit, an asset's capacity, a control's testing window. Everywhere else the level is read against the company's own history and the trend is the signal.

DefinitionOne of the few measures where the level, not the trend, is the finding: SLA attainment against a contracted target, a credit limit, an asset's capacity, a control's testing window. Everywhere else the level is read against the company's own history and the trend is the signal.

Why these four

Each has a number written down by someone else: a contract, a limit, a capacity, a frequency. Below or past it is a fact, whatever the direction.

Everything else

A level with no context is a debate. Its trend is a finding.

How it is used

A short list of measures where the level itself triggers action whatever the trend: a contracted service level, a covenant ratio, a regulatory limit. They are shown with the limit beside them.

Example

SLA attainment for one account is 91 percent against a contracted 95. It has improved for three months and is still a breach with a service credit due.

Where it goes wrong

Treated like other measures and read on trend. Improving is not the same as compliant.