Forecast established products from comparable sales history, then separate promotions, stockouts and changing demand. Follow a worked spreadsheet example and reconcile forecast errors before changing the next plan.
Demand forecasting for existing products uses comparable sales history to estimate future demand, then checks the estimate against what actually happened. The important work is separating routine sales from promotions, stockouts and a genuine change in the product's market. A low shipment figure means different things when customers stopped ordering and when the shelf was empty.
Use one row per SKU, site and week, or another period that matches the purchasing decision. Bring unit sales, forecast units, forecast issue date, promotion status and availability records. Keep returns and canceled orders identifiable instead of silently netting unlike transactions together.
Choose what actual demand means. Shipments are an observable measure, but they cannot reveal all orders lost during a stockout. Customer orders may be more useful when order dates and cancellations are reliable. Do not switch between these definitions during the comparison.
Freeze the forecast that existed when the decision was made. Comparing actuals with a forecast edited after the selling week measures hindsight. Keep the issue date beside the target period, even if the latest spreadsheet normally overwrites older versions.
A US office-supply distributor is forecasting an established carton of shipping labels. These historical weeks had the same pack size and distribution footprint, no promotion and full availability. Put units in B2:B5 on a history sheet.
| Historical week | Units sold |
|---|---|
| A | 100 |
| B | 110 |
| C | 105 |
| D | 105 |
| Total | 420 |
The ordinary weekly baseline is 420 / 4 = 105 units. In Excel:
=AVERAGE(B2:B5)
Microsoft defines AVERAGE as the arithmetic mean. Its documentation also distinguishes empty cells, which references ignore, from numeric zeros, which are included. A missing sales record therefore needs investigation before it becomes part of the baseline.
This short history illustrates the calculation, not a seasonal forecasting policy. For a seasonal item, compare the same selling periods and check whether customer coverage changed. Forecasting demand for an existing product does not make every old observation relevant.
The planner expects a promotion to increase ordinary demand by an assumed 20%. That assumption is not a measured effect: the promotional forecast is 105 × 1.20 = 126 units. Retain the ordinary baseline and the adjustment separately so the commercial team can explain the difference.
The review sheet below uses columns A:G and rows 2:5. Forecasts were saved before each week. The product remained available during the week flagged for a possible life-cycle change; that label calls for investigation rather than establishing a cause.
| Week and condition (A) | Forecast (B) | Actual shipments (C) | Comparable demand? (D) | Error (E) | Absolute error (F) | Review reason (G) |
|---|---|---|---|---|---|---|
| Routine | 105 | 110 | Yes | -5 | 5 | Ordinary trading |
| Promotion | 126 | 120 | Yes | 6 | 6 | Uplift assumption |
| Stockout | 105 | 80 | No | — | — | Constrained sales |
| Possible stage change | 105 | 90 | Yes | 15 | 15 | Persistent demand check |
In E2 and F2, filled down:
=IF(D2="Yes",B2-C2,"")
=IF(D2="Yes",ABS(E2),"")
Positive error means the forecast was high. The stockout row remains in the file, with its shipment gap visible, but is excluded from the comparable-demand score. Do not invent lost units to make it scoreable.
For comparable rows, forecast units total 336 and actual units total 320. Signed error is -5 + 6 + 15 = 16 units; absolute error is 5 + 6 + 15 = 26 units.
Weighted absolute percentage error = Sum of absolute errors / Sum of comparable actual units
Forecast bias = Sum of signed errors / Sum of comparable actual units
The scores are 26 / 320 = 8.1% absolute error and 16 / 320 = 5.0% positive bias, rounded to one decimal place. Calculate the comparable denominator explicitly:
=SUMIFS(C2:C5,D2:D5,"Yes")
=SUM(F2:F5)/SUMIFS(C2:C5,D2:D5,"Yes")
=SUM(E2:E5)/SUMIFS(C2:C5,D2:D5,"Yes")
Microsoft documents SUMIFS as adding cells that meet specified criteria. Use the same eligibility rule for both forecast and actual totals. The reconciliation is 336 - 320 = 16, matching the signed errors; investigate any disagreement before reporting accuracy.
For a larger export, forecast bias by SKU and site shows how to keep opposite misses from disappearing inside a company total.
The routine miss alone is not evidence that the baseline needs replacing. The promotion missed in the opposite direction, so raising every future week would also raise promotional forecasts that were already high. Ask the commercial owner whether the promotion ran as planned before changing its assumed uplift.
Check the possible stage change against customer orders, distribution changes and replacement products. Demand forecasting over the product life cycle covers that stage review; new product demand forecasting covers launches without usable sales history. Keep those jobs separate from this established-item comparison.
Covirage is not affiliated with Microsoft.
Bring a sample of your own sales export, dated forecasts, promotion flags and availability records. Covirage maps the columns, its tools compute and check the comparisons, and the external AI model explains the results with every figure traced to its rows. Create a free Covirage account, which takes about a minute, then set up your business and bring your files.
See Covirage for supply-chain teams for the supporting industry context.
Use enough comparable history to cover the patterns relevant to the decision. A seasonal item needs observations across its selling season, while a changed pack size or distribution footprint may make older history less useful. Record where history stops being comparable.
Keep them visible, but distinguish shipments from unconstrained demand. A stockout limits recorded sales, so a forecast above shipments is not automatically an overforecast. Score those rows separately unless you have a documented, supportable measure of unmet demand.
Not necessarily. Keep ordinary demand and the promotion assumption separate. After the event, compare actual sales with the combined forecast and review whether the uplift persisted, shifted demand from another period or simply reflected the temporary offer.